This site uses cookies to provide and improve your shopping experience.
If you want to benefit from this improved service, please opt-in.
Cookies Page.
- SOUND FITTED - Fitted with two Zimo MX644C DDC Sound Decoders – See below for the function list
- Directional Lighting and internal saloon lighting
- Five pole motor with flywheel providing drive to the leading bogie
- Twin axle drive
- Trailing axles run in metal pinpoint bearings
- Electrical pickup from all wheels
- Multi-stage gearbox, with gearing arranged for prototypical running speeds and haulage capabilities
- Detachable coupling pockets to NEM362 standards fitted to each driven bogie at the cab end
Conductive couplings with integral close coupling mechanism at the corridor end
- Designed to operate on curves of second radius (438mm) or greater
SOUND:
Two speakers fitted, one in each power car, for optimum sound reproduction
Sound decoders are fully synchronised and independently configured to play different sounds from each power car, depending on which
SOUND FITTED models operate on DCC and Analogue control as supplied. On Analogue control basic prime mover sounds are produced that will vary according to use, and directional lights and passenger compartment lights will illuminate when power is applied. If sufficient voltage is available, the leading cab lights will illuminate when stationary.
LIVERY APPLICATION:
Authentic liveries applied to all vehicles including interior decoration
Multiple paint applications employed using BR specification colours
Logos, numerals and text added as appropriate using multi-stage tampo printing using authentic typefaces, logos and colours.
WESTERN PULLMAN HISTORY
Born as a result of the 1955 British Railways Modernisation Plan, Midland Pullman 6-car units were built by Metro-Cammell of Birmingham from 1956-59. Part of a batch of five Blue Pullman sets, the two ’Midland Pullmans’ were designed to herald a new age in high-speed, luxury rail travel. The design was a striking streamlined body profile carrying a bold and bright ‘Nanking Blue’ livery. With its pair of 1000hp NBL/MAN engines and a top speed of 90mph, the Blue Pullman offered passengers luxurious high-speed travel with innovative new features, such as air-conditioning, a public-address system and reclining seats. Operations commenced on the Manchester Central to London St. Pancras service on 4th July 1960.
Completion of the West Coast Main Line electrification scheme in 1966 and the introduction of the new high-speed electric services from Manchester to London meant the end of Pullman operations on the BR Midland Region. Both sets were withdrawn and stored at Swindon until it was decided that they would be best utilised on the Western Region, operating alongside the three 8-car ‘Western Pullman’ sets already in service. Whilst at Swindon, modifications were carried out before they were formally transferred in March 1967.
Once in service both ex-LMR sets were based at Bristol Bath Road. The sets operated in a 12-car formation on the morning Bristol Temple Meads to Paddington service where they were then split – with one set working a mid-day return journey to Oxford, and the other a mid-day return to Bristol. Once back at Paddington, the sets would be recoupled back into a 12-car formation and work the return service back to Bristol Temple Meads in the evening.
Further modifications began in December 1969, when a cosmetic overhaul, including a refresh of the interior carpets and upholstery occurred, along with the downgrading of the first-class accommodation in the DMBFL and MFLRK vehicles to second-class. The most striking aspect of the overhaul was the application of a new livery which more closely followed the new corporate-image, a reversed version of the striking new BR Blue and Grey InterCity stock livery, in-keeping with what had already been applied to the new Mk2 air-conditioned Pullman vehicles operating on the West Coast Mainline. The BR ‘Double Arrows’ insignia and the word ‘Pullman’ was then applied to the lower bodyside of the power cars.
The end came with the dawn of 1973 and the introduction of air-conditioned Mk2 coaching stock, there was now little difference between the standards of regular-service coaching stock and the Pullman units. Combined with the fact that the sets were a unique fleet of 5 with increasing maintenance costs, the inevitable came on Friday 4th May 1973 when Western Region Pullman services ceased. An enthusiast special was run the following day with an itinerary which covered elements of the former Western Region routes operated by the trains throughout their service lives.
Code:
UK Delivery:
In stock items are usually despatched within 1-2 working days of ordering.
Return:
All returns must be received by us within 14 days of the date you received your order, please allow at least four days for postage. You will be required to cover the shipping and they must be returned via a traceable method – such as Royal Mail Signed For. We cannot accept responsibility for returned items until they are signed for by us.