Hornby BR Mk1 TSO W3817 BR Lined Maroon (WR)

Code: R40518
  • £44.99
  • (Delivery from £3.95 )
  • RRP £49.99
Item in Stock   |   Usually dispatched within 24 hours
Loading...

BR Mk1 TSO W3817 BR Lined Maroon (WR) 

The Mk1 was BR’s first standardised design of railway carriage with thousands built across BR’s carriage works in Derby, Wolverton, Doncaster, York, Eastleigh, and Swindon between 1951 and 1963. The design was also used on first generation Diesel Multiple Units (DMUs) until 1974 and for non-passenger stock such as parcel vans and full brake vehicles.

The new coaches gradually replaced older designs inherited from the ‘Big Four’ at nationalisation in 1968 and were used on all British Railways regions. The standard underframe length was 63ft 5in (19.33m) with gangwayed bodies 64ft 6in (19.7m), though suburban coaches and parcel vans were shorter.

Coaches were either fully open or were corridor coaches with seating compartments. Bodywork was of steel panels on wooden frames, with a separate underframe consisting of heavy steel sections braced with steel trusses, originally mounted on ‘BR1’ bogies, though these were superseded by a new cast-steel design from 1958 known as the ‘Commonwealth’ bogie. Later examples utilised a Swindon-designed ‘B4’ bogie which gave a much-improved ride and was adopted for use on Southern Region Mk1 Electric Multiple Units (EMUs).

- OO Scale

UK Delivery:

In stock items are usually despatched within 1-2 working days of ordering.

Return:

All returns must be received by us within 14 days of the date you received your order, please allow at least four days for postage. You will be required to cover the shipping and they must be returned via a traceable method – such as Royal Mail Signed For. We cannot accept responsibility for returned items until they are signed for by us.

Learn More